Good practice
How a guideline gets to the health worker
- Author in the app. The clinician writes the clinical content; the IT specialist adds what the generated application needs.
- Propose the changes: as a pull request when the project lives on GitHub or GitLab (see Saving and sharing), or as an exported
.triccfile. - Review: someone responsible for the content reads the change, activity by activity.
- Convert with tricc_oo to the target platform.
- Test the generated form on a device, and send the feedback to the authors.
- Release to production.
Maintenance follows the same cycle. Feedback can arrive at any time, and changes are collected, reviewed, approved and released in batches.
Recommendations
Keep each diagram manageable.
- A few seconds should be enough to see what a diagram does.
- Put complex logic in a calculation, in CQL, rather than in a web of decisions.
- Split long activities: an activity is reused through Go to activity, not copied.
Maintain the data dictionary.
- Give every concept a code. Reuse a concept rather than creating a second one with the same meaning.
- Define each concept properly (display, data type, concept type), so the data collected under it is not misused later.
Work in small iterations. Make a small change, convert, test. Every addition makes the whole more complex and gives it more ways to fail (an undefined concept, a loop). A small change also makes the broken part easy to find.
Change control
- The app saves one file per activity, so several authors can work on different activities without merge conflicts.
- Keep the latest version in one shared place. A git repository with pull requests gives every change an author, a review and a history.
When the conversion fails
- Read the log before drawing conclusions. Look at warnings and errors: a failed import, a processing error, an undefined concept.
- "Loop likely" or a conversion that never ends usually means:
- an activity or node leads back to itself, perhaps through many nodes in between;
- a calculation needs a concept that is only defined in a later activity.
- Check the activity's Validation tab first: it already flags unreachable nodes, a Go to without a target, and an activity without an end.
More in Converting with tricc_oo.

